The short answer

TNT Construction is a family business that has been remodeling homes in Northern Michigan since 1994. We are licensed and insured, and we remodel kitchens, bathrooms, basements, and whole homes in Petoskey, Boyne City, Harbor Springs, East Jordan, and the Walloon Lake area. Call or send the details through the quote form and we will walk the job with you and put the scope in writing.

Bathroom remodel in Charlevoix with a custom tile shower and niche
Bathroom remodel in Charlevoix with a custom tile shower and niche

Remodeling means living around the work, so we plan it that way. We protect the rest of your home, keep the site clean, and stay out of your way where we can.

Kitchens and bathrooms are our bread and butter, but we also finish basements and take on full renovations of older Northern Michigan homes.

New carpet and interior finish work in a finished room
New carpet and interior finish work in a finished room

We tell you up front what the work involves and what it costs, so there are no surprises halfway through.

Before we open walls, we walk the rooms with you, settle the scope, and write a clear quote and schedule so you know which spaces are out of use and for how long.

We seal off the work area, protect floors and finishes you are keeping, and clean as we go so the rest of the house stays usable.

When a remodel needs electrical, plumbing, or other specialty trades, we bring them in and coordinate the sequence so cabinets, tile, and finish work line up instead of stacking up.

From a single bath refresh to a whole-home update in Petoskey, Boyne City, or Harbor Springs, you get one point of contact and a crew that finishes the punch list before we call it done.

What this includes

  • Kitchens and bathrooms
  • Basement finishing
  • Whole-home renovations
  • Honest timelines and cleanup

Kitchen, bathroom, or whole home: what to check first

Kitchen, bathroom, or whole home: what to check first
ProjectWhat to checkRelated work
KitchenLayout and storage that are not working, whether plumbing or electrical may need to move, and how the rest of the house stays in use while the kitchen is open.This page
BathroomSoft floors, failed tile or caulk, ventilation, and whether it is the only bathroom. Layout changes and tile showers also need a look at plumbing and waterproofing.Bathroom remodeling
Whole homeWhich rooms should come first, whether the household will live in the house during the work, and any soft floors, water stains, or old wiring and plumbing already visible.This page

What to look for before you call

Note what you want changed and what you see. You do not need to know the cause. We walk the house with you.

  • Note which rooms you want to change, such as the kitchen, a basement, or a whole floor.
  • Note what is not working now, including the layout, storage, or dated finishes.
  • Note any soft floors, water stains, or old wiring and plumbing you have noticed.
  • Say whether you think walls might need to move.
  • Say whether you will live at home during the work.
  • Note any timing that matters, such as the season or a planned event.
  • Photos or sketches help if you have them, but they are not required.

Related: Bathroom remodeling, Windows, Siding.

Remodeling near you

See local jobs and what we do in each town: Petoskey, Boyne City, Harbor Springs, East Jordan, Walloon Lake.

Remodeling we have done

New window installed and trimmed out
New window installed and trimmed out
Gray home addition and exterior work by TNT Construction
Gray home addition and exterior work by TNT Construction
New exterior insulation and house wrap on a remodel
New exterior insulation and house wrap on a remodel

Every project is different. Reach out and we will walk through the details, timeline, and cost with you.

Remodel timeline

How long will my remodel take?

The short answer

A typical remodel runs from a few weeks of work for a bathroom with no layout change to several months for a whole home. Moving walls or plumbing adds rough-in and inspection time, and custom or special-order items add lead time before work starts. Your actual schedule is set after the walkthrough, and we put it in writing.

Exterior remodeling underway on a cottage in the Walloon Lake area
Exterior remodeling underway on a cottage in the Walloon Lake area

Typical remodel phases

Remodeling means living around the work, so it helps to know which phases keep your rooms in use and which do not. When a remodel needs plumbing, electrical, or other specialty trades, we bring them in and coordinate the sequence.

Typical ranges. Your actual schedule is set after the walkthrough.
PhaseWhat happensTypical rangeRooms in use?
1. Walkthrough and scopeWe walk the rooms with you, settle the scope, and put the scope and schedule in writing.1 to 2 weeks, longer for a whole homeYes
2. Ordering and lead timesCabinets, tile, fixtures, and other materials are ordered so they are on hand when the work needs them.1 to 4 weeks for stock items, 6 to 12 weeks for custom or special-order itemsYes
3. DemoThe work area is sealed off, the floors and finishes you are keeping are protected, and the old finishes come out.A few days to 1 weekNo
4. Rough-inFraming changes, plus plumbing and electrical by coordinated trades, all before the walls close.About 1 week when nothing moves, 2 to 3 weeks when walls or plumbing moveNo
5. InspectionRough-in work is inspected before it is covered up. Timing depends on the inspector's schedule.A few days to 1 week, longer when more work movesNo
6. DrywallNew or patched walls are hung, taped, finished, and given time to dry.About 1 to 2 weeksNo
7. Cabinets and tileCabinets go in, tile is set, and counters are measured and installed once the cabinets are in place.1 to 3 weeksNo
8. Finish and punch listFixtures, trim, and paint, then a walk through the punch list and cleanup before the job is called done.1 to 2 weeksNo

Timeline planner

Pick your project and the planner shows the typical phases and weeks. Nothing you pick is sent anywhere.

Project type
Do walls or plumbing move?
Any custom or special-order items?

Typical total, walkthrough to punch list

8 to 14 weeks

Before work starts, kitchen still in use
3 to 6 weeks
Rooms out of use
5 to 8 weeks

Rooms out of use: The kitchen is out of use from demo through the punch list, typically 5 to 8 weeks. Plan a temporary spot for the fridge, a microwave, and a coffee maker.

  1. 1.Walkthrough and scope1 to 2 weeks
  2. 2.Ordering and lead times2 to 4 weeks
  3. 3.DemoA few days to 1 week
  4. 4.Rough-inA few days to 1 week
  5. 5.InspectionA few days to 1 week
  6. 6.DrywallA few days to 1 week
  7. 7.Cabinets and tile2 to 3 weeks
  8. 8.Finish and punch listA few days to 1 week

Typical ranges. Your actual schedule is set after the walkthrough.

Insulation installation on a Boyne City home in winter
Insulation installation on a Boyne City home in winter

Worked example: one kitchen, two ways

This is a generic kitchen built from typical trade ranges, not a TNT Construction job. It shows how a layout change stretches the schedule.

Kitchen A: same layout
New cabinets in stock sizes go where the old ones were. The sink, range, and fridge stay where they are.
Kitchen B: layout change
The sink moves to a new wall and a non-load-bearing wall comes out to open the room. The new cabinet layout is special order.
Typical weeks for each kitchen. Typical ranges. Your actual schedule is set after the walkthrough.
PhaseKitchen A: same layoutKitchen B: layout change
Walkthrough and scope1 to 2 weeks1 to 2 weeks
Ordering and lead times2 to 4 weeks6 to 12 weeks
DemoA few days to 1 weekA few days to 1 week
Rough-inA few days to 1 week2 to 3 weeks
InspectionA few days to 1 week1 to 2 weeks
DrywallA few days to 1 week1 to 2 weeks
Cabinets and tile2 to 3 weeks2 to 3 weeks
Finish and punch listA few days to 1 weekA few days to 1 week
Before work starts, kitchen in use3 to 6 weeks7 to 14 weeks
Kitchen out of use5 to 8 weeks7 to 12 weeks
Typical total8 to 14 weeks14 to 26 weeks
  • Lead times move the start. Stock cabinets for Kitchen A typically arrive in 2 to 4 weeks. The special-order cabinets for Kitchen B typically take 6 to 12 weeks. The kitchen stays in use while you wait, but demo starts later.
  • Rough-in and inspection stretch the middle. In Kitchen A the plumbing and wiring stay close to where they are, so rough-in and inspection together typically run 1 to 2 weeks. In Kitchen B the drain and supply lines move, outlets and circuits move, and the framing changes, and all of it is inspected before the walls close. That typically runs 3 to 5 weeks, and the new walls add drywall time.
  • The kitchen is out of use longer. Kitchen A is typically out of use for 5 to 8 weeks and Kitchen B for 7 to 12 weeks. Either way, the written schedule from the walkthrough tells you which rooms are out of use and for how long.

Get a real schedule for your remodel

See kitchen remodel photos on our projects page, read how a bathroom remodel runs, or call (231) 347-7299 or (231) 330-1786. We walk the rooms with you and put the scope and schedule in writing before any work starts.

Get a quote
Painting, siding, and masonry on a large home on Lake Charlevoix
Painting, siding, and masonry on a large home on Lake Charlevoix

Questions

Remodeling FAQs

Common questions about remodeling with TNT Construction in the Greater Petoskey Area.

  • How long will my remodel take?

    A typical remodel runs from a few weeks of work for a bathroom with no layout change to several months for a whole home. Moving walls or plumbing adds rough-in and inspection time, and custom or special-order items add lead time before work starts. Your actual schedule is set after the walkthrough, and we put it in writing.

  • Can I live in my home during a remodel?

    Most of the time, yes. We plan the work so you can live around it where possible. We protect the rest of your home, seal off the work area, keep the site clean, and stay out of your way as much as the job allows. For bigger jobs we will tell you up front which rooms are out of use and for how long.

  • Do you do the whole remodel yourselves?

    We are a full-service general contractor, so we handle the build and manage the job start to finish. When a remodel needs electrical, plumbing, or other specialty trades, we bring them in and coordinate the schedule so the work lines up and you deal with one team.

  • What kinds of remodels do you take on?

    Kitchens and bathrooms are our bread and butter, but we also finish basements and take on full renovations of older Northern Michigan homes. If you are not sure whether your project fits, call and we will talk it through.

  • Do you remodel bathrooms?

    Yes. Kitchens and bathrooms are our bread and butter. We do full bathroom remodels and tile work, including custom tile showers. See our bathroom remodeling page for more on how a bathroom job runs.

  • Do you remodel kitchens?

    Yes. We remodel kitchens and coordinate the electrical, plumbing, and other trades the work needs so cabinets, counters, and finish work line up. We walk the kitchen with you first and put the scope in writing before work starts.

  • Do you take on whole-home renovations?

    Yes. Along with single rooms, we finish basements and take on full renovations of older Northern Michigan homes. You get one point of contact for the whole job.

  • What towns do you remodel in?

    We remodel throughout the Greater Petoskey Area, including Petoskey, Boyne City, Harbor Springs, East Jordan, and the Walloon Lake area. If you are nearby and not sure, just ask.

  • Are you licensed and insured?

    Yes. We have been a licensed and insured contractor working in the Petoskey area since 1994.

  • What should I note before a remodel quote?

    Note which rooms you want to change and what is not working now, including layout, storage, or dated finishes. Call out soft floors, water stains, or old wiring and plumbing you have noticed, and say whether walls might need to move. Tell us if you will live at home during the work and any timing that matters, such as the season or a planned event. Photos help if you have them, but they are not required. We walk the house with you and put the scope in writing.

  • How do I get a quote for a remodel?

    Call (231) 347-7299 or (231) 330-1786, email tnt.construction@ymail.com, or send the details through the quote form. We serve the Greater Petoskey Area, including Boyne City and Harbor Springs, and we are open Monday to Friday 8 am to 6 pm, Saturday 9:30 am to 2 pm, and Sunday 10:30 am to 7 pm.

  • What is different about planning a single-room remodel and a whole-home renovation?

    A single-room remodel is contained, so that room can be sealed off while the rest of the house stays in use. A whole-home renovation has to sequence several rooms so the household can still live around the work, and a problem in one area can affect the next. Keep those questions separate when you compare plans.

Cleaning and painting the siding of a downtown Petoskey building from a lift

Start here

Ready to talk about your project?

Tell us what you have in mind. We will give you a straight answer and a fair quote.